New Pedestrian Bridge in Athlone, Co. Westmeath
- ECOFLEX SURFACING LTD
- May 24, 2023
- 1 min read
Ecoflex Surfacing Ltd was contracted to completed surface preparatory works to include shotblasting of steel structure, application of the Eliminator One Coat Waterproofing System
overlaid with a Safetrack HFS MMA and 0.9-1.2mm Chinese Buff Bauxite Aggregate.
Works completed in May 2023
Comments